Inside a newly framed house, light coming through the wall openings
Base
Calgary, AB
Coord
51.05° N 114.07° W
Trade
Framing · Cribbing · Stairs
Scope
Footings to frame

Every trade after us builds on this.

Three quarters of an inch out becomes every trade's problem.

Plumb. Square. Ready for the next trade.

Framing, cribbing and stairs across Calgary. One crew from the footings up.

SCROLL

Approach

Four stages, nobody to chase.

On most builds the footings, the frame and the stairs are three different trades, three schedules and three people to phone when something slips. We carry all four stages, so the handoffs happen inside our crew instead of yours.

STAGE 0101

Cribbing and shoring

Footings and foundation walls formed, braced and set to line before any concrete shows up.

STAGE 0202

Structural frame

Floors, walls and roof. Plumb, square, and laid out where the drawings actually put it.

STAGE 0303

Stairs

Built on site to the opening you have, with consistent rise and run built to meet inspection requirements.

STAGE 0404

Handoff

Site swept, deficiencies closed, and a frame the mechanical trades can start on the same week.

You manage one schedule instead of coordinating three.

By the numbers

The record so far, in numbers.

PROJECTS

10+

Completed builds, from single-family homes up to a ten-plex, footings to frame.

YEARS

2.5+

Running under our own name, with framing experience that goes back much further.

RATING

5★ / 5

Every client so far has been satisfied with the work. Ask us for references.

PAPERWORK

100%

Liability insurance, WCB Alberta coverage, and required paperwork coordinated before mobilization.

Try it

A bowed stud looks fine until the drywall goes on.

Framers run a string line down a wall to find the studs that have crowned or twisted, then pull them true before anything closes in. Miss it and the wall reads wavy under the board forever. Hold the button and pull this one straight.

OUT OF PLUMB3/4"

PRESS AND HOLD

What we build

Structural work, start to trade-ready.

New builds, additions, renovations and rental units across Calgary and the surrounding area.

A large custom home framed and sheathed in winter with a telehandler on site

Structural framing

01

New builds, second-storey additions, garages and renovation framing. Walls plumb, floors flat, openings where the plans put them. We frame to the Alberta Building Code and we do not leave problems behind the drywall for the next trade to find.

  • NEW BUILDS
  • ADDITIONS
  • GARAGES
  • RENOVATION FRAMING
A wooden exterior staircase framed on site with stringers and treads in place

Custom stairs

02

Stairs are the one piece of framing people touch every day for the next forty years. We build them on site to fit the opening you actually have rather than the one on the drawing, with consistent rise and run built to meet inspection requirements.

  • OPEN RISER
  • BOX STAIRS
  • BASEMENT
  • GUARD FRAMING
Foundation footing forms with rebar laid out in an excavated basement

Cribbing and shoring

03

Formwork that lets go is how people get hurt, so we set it properly every time. Footings and foundation walls formed and braced, plus temporary shoring for excavation, lifting and below-grade work.

  • FOOTING FORMS
  • WALL FORMS
  • SHORING
  • BELOW GRADE
A row of multi-unit townhomes framed and sheathed at dusk

Rental units, footings to frame

04

Duplexes, triplexes and multi-plex projects up to ten units. We pick it up at the cribbing and hand it over as a complete frame, which means one crew on your site and one number to call when the schedule moves.

  • DUPLEX
  • TRIPLEX
  • UP TO 10 UNITS
  • FULL SCOPE

Selected projects

Work that speaks for itself.

A few of the builds we have carried from the footings up. Ask and we will walk you through any of them, or put you in touch with the client.

A row of multi-unit townhomes framed and sheathed at dusk
10-Plex · Calgary

Ten-unit rental building

Scope
Foundation and framing, footings to a trade-ready frame
Status
Completed 2026
Foundation footing forms with rebar laid out in an excavated basement
Triplex · Calgary

Three-unit infill

Scope
Footings to frame: cribbing, structural frame and stairs
Status
Completed
A large custom home framed and sheathed in winter with a telehandler on site
Custom home · Calgary

Two-storey custom build

Scope
Structural framing, winter build
Status
Completed

Who we work with

Three kinds of client, one standard.

01

Homeowners

Building new, adding a second storey, or opening up a floor plan. You deal with the people doing the work, not a project manager relaying messages.

02

General contractors

A framing crew that hits its dates, keeps the site clean and hands off clean. Your next trade can start on schedule.

03

Investors and developers

Duplex through ten units. Full structural scope under one crew, with scope and pricing clearly defined up front.

Straight answers

The questions you were going to ask anyway.

These are the things people actually want to know before they let a crew onto their site. Better answered here than avoided.

01How long have you been doing this?

Dosanjh Construction has been running under its own name for over two and a half years, with more than ten completed projects ranging from single-family homes to a ten-plex. The framing experience behind the crew goes back a lot further than the business licence does.

We would rather say that plainly than let you find out later. Every client we have worked with so far has been happy with the result, and we are glad to put you in touch with them before you decide.

02Are you insured, and can I see proof?

Yes. Dosanjh Construction carries liability insurance, is covered under WCB Alberta, and coordinates the required paperwork before mobilization on every job.

Ask and we will send the certificate before you sign anything, so you can read the policy number and the coverage limits yourself instead of taking a yes over the phone.

03Why is your quote not the cheapest?

Sometimes it is. When it is not, the gap is usually scope. A number well under everyone else generally means something was left out, or a corner is getting cut somewhere you will not see until later.

Ask us to itemize it. If a line does not make sense, we will explain what it covers and what happens if you skip it.

04Who is actually going to be on my job?

Our crew. Roop Dosanjh runs it and is on site, so the person you talk to about the job is the person responsible for it.

We do not win the work and then hand it to whoever is available that week. If that changes on a particular job, you hear it from us before it happens, not after.

05What if something is wrong after you leave?

Call us and we come back. Framing problems surface when the next trade starts, which is usually days later, and that is exactly when we would rather hear about it than a year on.

Contact request

Have a project in mind? Let's talk.

Whether it is a new build, an addition, or just an idea, send it over. We aim to respond the same business day, and if it is not work we are the right crew for, we will say so.

Goes straight to the office inbox. In a hurry, call or text 778-788-4748.

Sent. We will be in touch.

Roop or someone on the crew aims to reply the same business day. Need it faster? 778-788-4748.

Owner
Roop Dosanjh
Call or text
778-788-4748
Email
dosanjhconstruction5@outlook.com
Office
#8 – 204, 4393 14 Street NE
Calgary, AB T2E 7A9
Service area
Calgary and surrounding area
Instagram
@dosanjh_construction